Powered By Kitlog Pro v2.0
Phillips Zodiac is FOR SALE
Zodiac 601 XL
All
7-27-2010
< Previous Log Entry
Next Log Entry >
Date:
7-27-2010
Number of Hours:
4.00
Manual Reference:
Brief Description:
Reinstallation of stick controls
Reinstalled the torque tube and the dual sticks.
Rerouted some of the wires and brake lines through the spar below the torque tube bearing.
Added penny washers to the rod end joints for safety.
Adjusted rudder cable clearances through the lightening holes at the back of the seats.
A bit of a mess but it's getting there
That rod end will never come off no matter what
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 601 XL Home
Category
# Logs
# Hours
All
340
710
650 Canopy
30
68
Avionics
29
58
Back home
1
Controls
14
30
Empennage
8
15
Engine
8
10
Firewall forward
32
70
Fuel system
1
1
Fuselage
19
48
Fuselage upgrade
27
68
Miscellaneous
2
Paint
5
28
Pickup day
2
Prop
1
0
Rudder
6
18
Tools
1
Undercarriage
16
39
Upgrade
58
110
Upholstery
15
24
Wings
7
13
Wings and Upgrade
58
110
Copyright © 2001-2024 Matronics. All Rights Reserved.