Yesterday and today was taken up fabricating and priming the F-840 and F-841 elevator pushrods. This was a similar process to that of the aileron pushrods. Both rods were assembled, drilled, disassembeled, deburred, and primed. Today they were put together. Looking forward to installing them :) The elevator aft fuselage bellcrank was also fabricated, primed, and assembled. Lots of visual progress!