Powered By Kitlog Pro v2.0
COLIN'S WEB SITE
RV-6A
Fuselage
11-30-2014
< Previous Log Entry
Next Log Entry >
Date:
11-30-2014
Number of Hours:
0.00
Manual Reference:
Brief Description:
Windshield Installation 5
I have been doing more trimming and sanding on the windhiels faring. As much as I can do while the faring is off the plane and there is no risk of a slip. I would not want to mess up now and damage the windshield.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
949
0
Avionics/Electrical
56
Empennage
39
Engine
88
Engine/FWF
88
Final Assembly
6
Fuselage
370
Interior Finishing
3
Left Wing
88
Miscellaneous
14
Paint / Finishing
8
Panel
27
Right Wing
64
Tools
10
Wings
88
Copyright © 2001-2024 Matronics. All Rights Reserved.