Powered By Kitlog Pro v2.0
COLIN'S WEB SITE
RV-6A
Fuselage
3-18-2012
< Previous Log Entry
Next Log Entry >
Date:
3-18-2012
Number of Hours:
0.00
Manual Reference:
Brief Description:
Fuel Feed & Vent Lines 2
More work today On the vent lines. I fabbed up the secod line and then routed both lines to the vent fittings in the floor. I left the holes for the cushion clamps at 1/8" for now I'll drill them to size later.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
949
0
Avionics/Electrical
56
Empennage
39
Engine
88
Engine/FWF
88
Final Assembly
6
Fuselage
370
Interior Finishing
3
Left Wing
88
Miscellaneous
14
Paint / Finishing
8
Panel
27
Right Wing
64
Tools
10
Wings
88
Copyright © 2001-2024 Matronics. All Rights Reserved.