Powered By Kitlog Pro v2.0
COLIN'S WEB SITE
RV-6A
Left Wing
5-31-2009
< Previous Log Entry
Next Log Entry >
Date:
5-31-2009
Number of Hours:
0.00
Manual Reference:
Brief Description:
Leveling Left Wing in Jig
Leveled the left main spar in the jig. Checked it ten ways from Sunday and rechecked on before starting work each day.
Checked with both bubble and digital level
Check rear spar level
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
949
0
Avionics/Electrical
56
Empennage
39
Engine
88
Engine/FWF
88
Final Assembly
6
Fuselage
370
Interior Finishing
3
Left Wing
88
Miscellaneous
14
Paint / Finishing
8
Panel
27
Right Wing
64
Tools
10
Wings
88
Copyright © 2001-2024 Matronics. All Rights Reserved.