I have been bad about updating my build log lately. This entry covers 9/22-10/5. Most of that time was spent cleaning up the wire routing and finalizing the wiring for the Comm and Xponder. I cleaned up all the wiring running through the center tunnel. I added some loom to where the wires transition into the tunnel for a clean look and some extra protection.
I also fabbed up the brackets to support the Xponder and Audio panel trays. I made a triangular bracket and attached it to the sub-panel. Then some 0.032 angle connect to the bracket to support the rear of the audio panel.