KitLog pro

Powered By Kitlog Pro v2.0

COLIN'S WEB SITE
' style=
Date:  7-10-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Canopy Rails Reinstalled 2

Today I riveted the left side rail back on. Before doing so, I installed some 1/4" tibe in the gap above the F-604 to act as a conduit for the flood-light wiring. The tube is the same stuff as the pitot/static lines. DOT air-brake hose.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.