Powered By Kitlog Pro v2.0
COLIN'S WEB SITE
RV-6A
All
5-15-2011
< Previous Log Entry
Next Log Entry >
Date:
5-15-2011
Number of Hours:
0.00
Manual Reference:
Brief Description:
Cabin Tunnel / Heater Cover 1
Today I did some prep work on the cabin tunnel. First I bent the louvers (that was fun). I then drilled / riveted the heater baffle and fuel-pump cover nutplates. I fit the tunnel in place and marked for drilling the floor stiffeners.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
949
0
Avionics/Electrical
56
Empennage
39
Engine
88
Engine/FWF
88
Final Assembly
6
Fuselage
370
Interior Finishing
3
Left Wing
88
Miscellaneous
14
Paint / Finishing
8
Panel
27
Right Wing
64
Tools
10
Wings
88
Copyright © 2001-2024 Matronics. All Rights Reserved.