More work on the forward fuselage. I did a bit more trimming and fitting of the ribs where they pass through the sub-panel. I then fabbed and drilled the angle support to the panel. With everything in place I clamped a strip of scap across the panel and rib fllanges to make sure everything was flush and drilled the angle to the ribs.