After work today I started back in on the baggage area. I finished fitting, trimming, bending and drilling the baggage sidewalls. I then stated in on the baggage floor. I mesured the area created by the bulkheads, ribs, and sidewalls and then trimmed the rectangular sheet to fit. After a tiny bit of filling I had a perfect fit. I clamped the skin in place and traced the rib locations onto the skin. I then pulled the skin, layed out the rivet pattern and pilot-drilled the holes. I put the skin back in place and match-drilled the baggage ribs. I did this for both halves of the baggage floor.