KitLog pro

Powered By Kitlog Pro v2.0

COLIN'S WEB SITE
' style=
Date:  5-13-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Fuselage Jigging 2

Today I started to "officially" jig up the fuselage. Throughout the week I was deburring and priming bits and pieces, but didn't get a lot done since I was stuck late at work a number of days. I also re-checked and leveled the entire jig. I then positioned the firewall and bolted it to the vertical jig members. I added additional members to the vertical to make sure the firewall stayed in position. I then ran equal-length bits of safety wire from the engine mount brackets back to the last bulkhead position 'triangulating' the bulkhead to confirm that everything was square.


I used a level and plumb-bob to make sure all the bulkheads were centered as I clamped them to the jig.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.