KitLog pro

Powered By Kitlog Pro v2.0

COLIN'S WEB SITE
' style=
Date:  5-7-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Control Fitting to Main Spar 3

With the cutouts in the spar carrythrough complate I did a final fit of the controls. I then deburred, primed and painted the aluminum bits. I used a high-temp paint and then baked it on at 250 degrees. This stuff is tough as nails once baked on. The white isn't and exact match to the powercoated steel parts, but it looks better than green primer.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.