Powered By Kitlog Pro v2.0
Christophers Web Site
RV-7A
Empennage
2-25-2007
< Previous Log Entry
Next Log Entry >
Date:
2-25-2007
Number of Hours:
6.00
Manual Reference:
Brief Description:
Left and Right Elevators
I was on a role with the stiffiners and dimpling. So, I installed the stiffiners on both the left and right elevators; back riveting technique throughout.
Elevator 1
Elevator 2 (cut out for trim tab)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
36
280
Empennage
19
144
None
2
Wings
13
128
Work Space
2
8
Copyright © 2001-2024 Matronics. All Rights Reserved.