Powered By Kitlog Pro v2.0
Bows Web Site
S-20 Super Raven
Covering
6-27-2017
< Previous Log Entry
Next Log Entry >
Date:
6-27-2017
Number of Hours:
3.00
Manual Reference:
08
Brief Description:
Stab Cont
Continue to work on horizontal stabs. Trim the edges and iron down. Glue edges and let dry iron up to 375 on both stabs. Installed lexan strips and rivet them on both sides both pices began to work on patches.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Super Raven Home
Category
# Logs
# Hours
All
64
1525
Covering
23
167
Fuselage
9
645
Miscellaneous
7
193
Paint
11
200
Wings
14
320
S-20 Super Raven Home
Copyright © 2001-2024 Matronics. All Rights Reserved.