KitLog pro

Powered By Kitlog Pro v2.0

Bows Web Site
' style=
Date:  4-5-2017
Number of Hours:  10.00
Manual Reference:  08
Brief Description:  Fuse Patches/ Tapes

Installed the lexan strips per the manual on the vertical stab, Used template to locate elevator exits and inspection covers, rudder cable exits. Bond the rings per the manual. Cut out the rudder cable exits, Bonded the rudder cable exits per the manual and cut out patches for the bottom and rear on fuse, Installed the inspection rings, drains, and other misc patches and belly tapes.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.