Powered By Kitlog Pro v2.0
Bows Web Site
S-20 Super Raven
Covering
3-20-2017
< Previous Log Entry
Next Log Entry >
Date:
3-20-2017
Number of Hours:
12.50
Manual Reference:
08
Brief Description:
Wings
Finish gluing the fabric per the manual, Installed the lexan hold down strips on the ribs both top, bottom LH and RH wings, Burned holes and rivet the strips per the manual directions.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Super Raven Home
Category
# Logs
# Hours
All
64
1525
Covering
23
167
Fuselage
9
645
Miscellaneous
7
193
Paint
11
200
Wings
14
320
S-20 Super Raven Home
Copyright © 2001-2024 Matronics. All Rights Reserved.