KitLog pro

Powered By Kitlog Pro v2.0

Bows Web Site
' style=
Date:  6-27-2017
Number of Hours:  3.00
Manual Reference:  08
Brief Description:  Stab Cont

Continue to work on horizontal stabs. Trim the edges and iron down. Glue edges and let dry iron up to 375 on both stabs. Installed lexan strips and rivet them on both sides both pices began to work on patches.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.