KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  11-9-2014
Number of Hours:  4.00
Manual Reference:  Section 7
Brief Description:  Rib Preparation

Finally finished the last of the edge finishing on ribs and lightening holes. Logged about 16 hours total to prep the ribs. Seemed like much longer than that.

Next step in the plans is to make the flanges 90 degrees to the web. I built the flange tool and it works very well. Adjusted all the ribs for the right wing in about an hour. Spot checks throughout show the flanges are consistently square to the web.
' style=

Last edge finishing

Last edge finishing

' style=

Flange tool at work

Flange tool at work

' style=

Close up of flange tool

Close up of flange tool

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.