KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  7-1-2018
Number of Hours:  2.00
Manual Reference:  N/A
Brief Description:  Begin SB 2014-01-31

I decided to do the Service Bulletin on the horizontal stab before beginning work on the fuselage. Read over the instructions several times and watched a good video on you-tube to get familiar with the entire process. Began removing the rivets on the inboard nose and main ribs on the top of the stab. Drilled with #42 bit, removed the factory head and used a spring punch with a bucking bar for support to punch out the rivet bodies.
' style=

Study the instructions

Study the instructions

' style=

Begin removing rivets

Begin removing rivets

' style=

Top side almost done

Top side almost done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.