KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  12-8-2013
Number of Hours:  4.00
Manual Reference:  Section 6
Brief Description:  Right Elevator Drilling

Drilled the stiffeners and the skin on top and bottom of right elevator to final size with a #40 bit. Used a piece of MDF for the backing so I could cleco the stiffeners to the board as I drilled. Deburred all the stiffener holes in the skin and stiffeners. Scuffed the stiffeners and skin with a scotchbrite pad in preparation for priming.
' style=

Drilling Stiffeners

Drilling Stiffeners

' style=

Deburring

Deburring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.