KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  1-30-2024
Number of Hours:  2.50
Manual Reference:  Section 8
Brief Description:  Complete Firewall Wire Pass Thrus

Finished the lower pass thru as per instructions. Put the firesleeve and clamps on both. This is as far as I can go until I run the wires.

Made a grounding lug from 1/4 x 20 all thread and put it in firewall at location suggested in plans. Main battery ground will connect on engine side, Other grounds will be routed to the lug on the back of firewall.

Installed a nutplate and screw for an Adel clmp to hold the left side wiring conduit
' style=

Pass thrus complete

Pass thrus complete

' style=

Main grounding lug

Main grounding lug

' style=

Mount for Adel clamp

Mount for Adel clamp

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.