KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  7-30-2020
Number of Hours:  5.50
Manual Reference:  Section 8
Brief Description:  Prime Parts, Install Crotch Strap Brackets

Set up the paint table and primed the crotch strap brackets and F-715s with NAPA 7220 primer. While those were drying, I scuffed the forward and aft seat floors to prep for prime. Decided to experiment with some final top coat on the floors, so I scuffed the entire top side of the floors. Washed them all in Dawn dish soap and warm water and set aside to dry overnight.

Installed the crotch strap brackets with pulled rivets as per the plans. Used all three of my rivet pullers at one time or another to finally get all the rivets set on these brackets.

Prepared platenuts for the F-715s by dimpling and running the tap through.
' style=

Ready to prime

Ready to prime

' style=

Floor prep

Floor prep

' style=

Brackets installed

Brackets installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.