KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  4-4-2020
Number of Hours:  2.00
Manual Reference:  Section 8
Brief Description:  Finish Riveting Lower Aft Fuselage

Got Frances out in the shop to help again on rivets I couldn't reach by myself. We finished the rivets on the curves that join the fuselage sides to the bottom. Most rivets went well, removed the front bulkhead to provide better access and then re-installed it. Had one bad rivet, so we flipped the fuselage, drilled out, then replaced with a good rivet. Finally done with the aft fuselage (for a while).
' style=

Frances mans the bucking bar

Frances mans the bucking bar

' style=

Reinstalling forward bulkhead

Reinstalling forward bulkhead

' style=

Done from J-channels down

Done from J-channels down

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.