KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  12-27-2019
Number of Hours:  3.00
Manual Reference:  Section 8
Brief Description:  Drill Aft Fuselage Skins to Bulkheads

Was still having some difficulty getting all the clecos in the pre-punched holes in the tail section. Used the #40 reamer to open the holes in F-779 to full size to help with alignment. Got as many clecos in as I could, then began match drilling the tailcone to the bulkheads, removing one or two clecos at a time, drilling and reinstalling. Was able to get all of the clecos in on the left side and most on the right. Continued drilling and eventually was able to get all the tailcone cleco'd.

Cleco'd every other hole on the side skins to the bulkeads and drilled them, then moved clecos and drilled remaining holes. Rolled the fuselage over and set up bottom with a cleco in every other hole.
' style=

Ream F-779

Ream F-779

' style=

Cleco and drill

Cleco and drill

' style=

Prepare to drill bottom

Prepare to drill bottom

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.