Made the F-705 J, K, and L parts. Completed layout of F-605C bar doublers and cut out on band saw. Finished edges with sander, files, and scotchbrite. Clamped the bar to the F-705A and match drilled. Match drilled the bar doublers and spacers. DIsassembled and deburred all holes.