Brief Description: Secure Wires, Install Baggage Area
I put some spiral wrap on the ADSB cable where it passes close to the baggage floor. Then I secured the conduit in the central tunnel under the baggage area with zip ties. Re-installed the baggage area sheet metal pieces, to include the back wall. Still not certain all of this is permanent, so I put it in with cleco's and a few screws.