KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  2-19-2024
Number of Hours:  1.50
Manual Reference:  Section 8
Brief Description:  Final Install Roll Bar

I painted the edges of the roll bar legs. Once dry I put it back on the fuselage with the bolts in the correct direction. Had trouble getting the stack up of spacer, washer, and nut onto the bolts working upside down under the canopy rail. After a few droppped parts I decided to use a dab of EZ Turn fuel lube to help hold the parts in place. This worked well, the lube held the spacer to the underside of the rail and then the washer on the nut. I also put a spacer under the nut in the socket wrench. All this allowed me to easily reach under the rail and start the nuts on the bolts. Then I tightened and torqued the nuts and marked them with torque seal.
' style=

Roll bar with bolts

Roll bar with bolts

' style=

Fuel lube

Fuel lube

' style=

Nuts installed and torque.

Nuts installed and torque.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.