KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  4-25-2023
Number of Hours:  2.50
Manual Reference:  Section 8
Brief Description:  Prime F-789, Begin F-790

Primed the F-789 with NAPA 7220 primer. Hung the tube from a folding ladder, sprayed primer down the inside until it ran out the other end, reversed and sprayed again. Sprayed outside of tube and let dry in the sun.

Made F-790 per plans length. The threaded rod ends were very tight in the tube, so much so that I could not fully insert them. Used Dremel sanding drum and scotchbrite wheel to relieve inside of tube slightly. This allowed a snug fit and proper insertion of the ends. Used the same tape technique as on the F-789 to space the rivets around the tube. Got both ends marked for drilling.
' style=

Primer rig

Primer rig

' style=

Fit threaded rod ends

Fit threaded rod ends

' style=

Drilling layout

Drilling layout

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.