Powered By Kitlog Pro v2.0
Stephens Web Site
RV-7
All
4-26-2021
< Previous Log Entry
Next Log Entry >
Date:
4-26-2021
Number of Hours:
2.00
Manual Reference:
Section 8
Brief Description:
Prime Baggage Bulkhead
Washed the F-751 and F-652 along with the caps for F-705 bulkheads with warm water and Dawn dish soap. Set aside to dry.
Removed plastic and fit the F-748 baggage tunnel cover. Had to adjust the bend on the aft flange to improve the fit. Deburred edges and holes.
Used NAPA 7220 self etching primer to prime the baggage bulkheads and the caps.
Wash parts
Prep F-748
Prime parts
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
1003
2671
Empennage
107
354
Engine
10
13
Fuselage
564
1488
Miscellaneous
2
1
Shop Supplies
10
17
Tools
2
5
Wings
308
793
Copyright © 2001-2024 Matronics. All Rights Reserved.