Removed the F-715s and deburred all the holes in the ribs, skin, and bulkheads. Drilled the top flange for platenuts and deburred those holes as well. Scuffed the ribs with scotchbrite and dimpled with the squeezer. Washed the ribs and crotch strap brackets in Dawn dish soap and warm water and set them out to dry overnight.