Did the finish work on the firstF-623 aft attach strap. Followed same process to make a second strap. Match drilled the aft attach straps to F-623 and marked for left and right. Match drilled the forward straps and saw a rivet clearance issue. Made an allowance in the strap to accomodate the rivet. Assembled the F-704 A and B for drilling.