Used the squeezer to continue setting rivets on the bulkhead sides and corners. Flipped the structure over to insert rivets for the bar from the back side. First two rivets were slightly off center, so after riveting the bar on securely went back and drilled these and repaced them. Second attempt resulted in good rivets. Completed riveting on the bar doublers, then bolted on the seatbelt anchors.