KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  11-14-2018
Number of Hours:  1.00
Manual Reference:  Section 8
Brief Description:  Repair Drilling Mistake

Got a response from Van's on the drilling mistake I made back on 9 Oct. I sent a description of the mistake along with pictures, measurements and plans references. The verdict was I got lucky and the mistake was not catastrophic. Van's said to deburr the hole, prime and build on. I deburred, filled the hole with JB-weld, then primed. A relief not to have to replace the aft bulkhead.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.