No pictures today. Wet installed the rivets on the top side of tank for the two remaining ribs using same technique as before. Turned tank around and put rivet in every third hole from nose aft on center rib on bottom of tank. Started sealing shop heads of tank rivets with sealant left over at the end of this session.