KitLog pro

Powered By Kitlog Pro v2.0

Stephens Web Site
' style=
Date:  1-10-2016
Number of Hours:  3.00
Manual Reference:  Section 7
Brief Description:  Continue Tank Prep

Completed scuffing parts for both fuel tanks. Scuffed baffle on both sides for sealing the rib to baffle and baffle to z-bracket locations. Plan to scuff between z-brackets and outside of end ribs after assembly and prime the outside of tank after leak check is complete. Scuffed mating side of z-brackets.

Dimpled all tank ribs and stiffeners for both tanks.
' style=

Scuff tank baffles

Scuff tank baffles

' style=

Dimple stiffeners

Dimple stiffeners

' style=

Dimple ribs

Dimple ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.