Completed scuffing parts for both fuel tanks. Scuffed baffle on both sides for sealing the rib to baffle and baffle to z-bracket locations. Plan to scuff between z-brackets and outside of end ribs after assembly and prime the outside of tank after leak check is complete. Scuffed mating side of z-brackets.
Dimpled all tank ribs and stiffeners for both tanks.