Date:  4-6-2014
Number of Hours:  2.50
Manual Reference:  Section 6
Brief Description:  Finish Right Elevator

Followed same procedure as left elevator with rolling and hand work to make a good fit for the leading edge. Riveted the leading edge. Installed the rod-end bearings per the plans.

Began the test fitting of the right elevator on the horizontal stab. After first attempt we set the rod end bearings to max extension per the plans: 7/8 inch. Was able to insert bolts to check how much the horizontal stab skin will have to be trimmed to make the counterweight fit. Marked the stab for the cuts.