Washed all the parts in dawn dish soap and air dryed on 23 Dec. Weather turned cold on 24 Dec so I set up the paint booth in the garage to prime the parts. Booth worked well to control both paint and fumes. Primed all the stiffeners, E-615PP, and inside of the skins with NAPA 7220 in preparation for riveting.