Brief Description: Rivet elevator brackets and forward spar
Back to work after our trip to Germany, Austria, Croatia and Italy. Riveted the HS-412 and HS-413 hinge brackets to the rear spar. Used the same technique as the other spar rivets: Cleaveland C-frame and back rivet tool. Bolted in the HS-411 center bearing. First use of the new inch-pounds torque wrench. Book said to use 20 - 25 inch pounds, so I set it at 23 inch pounds. Riveted the HS-710 and HS-714 to the front spar. Used the C-frame technique here, too. Had to drill out my first rivets. I put rivets in the holes for the HS-405 rib on the right side. Caught the mistake before I put the rivets in on the left.