Brief Description: Drill left stabilizer to final size
Reassembled left stabilizer for final drilling. Frances helped with getting the skin back on and everything lined up for clecos. Drilled to final size using the skin as a drill guide. Also ran a #40 reamer through all the holes. The countersink in the angles was not deep enough to allow the spar to lay flat. When I cut them the first time I used a rivet to check the depth, but that was insufficient for a dimple. Slowly adjusted the micro-stop counter sink to get deep enough for a good fit.