These jacks took much longer than I expected to install. The mounting plates were 4 hours of fabrication and the routing of wires from the GMA 240 and soldering them to the jacks took another 4 hours. I hope to get the rest of the GMA 240 wiring done, including the PTT switches on the stick the next time in the hanger and maybe even test them under power.