OK, the wiring is almost done. There is still some hookup to do in the wings when I put them on and I need some more 18Awg wire to hook up the defroster fans, but that needs to be done when I install the front fuselage deck. But, other than that, the wiring is done. I did get everything powered up and tested to a point. The reality is, I cannot check out the GRT EFIS and EM until I program them and that is a big job with considerable planning. I think I will do that after all the construction is done and I can sit in the plane.