Powered By Kitlog Pro v2.0
Carl Bells RV7A N947CB
RV 7A
Engine Wiring
2-16-2009
< Previous Log Entry
Next Log Entry >
Date:
2-16-2009
Number of Hours:
5.00
Manual Reference:
GRT EIS Manual
Brief Description:
Wiring the EIS
I’m getting near the end of the EIS wiring other than the power to the monitor itself. I finished all of the CHT and EGT probe wiring, fuel and pressure sensors, oil temperature and will finish up the current sensor wiring next.
The ground plane
Current sensor
Fuel and oil pressure
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 7A Home
Category
# Logs
# Hours
All
524
2392
*Project Status*
4
1
Avionics
31
163
Canopy
50
254
Control Systems
42
211
Cowl and Baffle
38
182
Elevator
15
80
Empennage
14
60
Engine
22
76
Engine Wiring
4
19
Fiberglass Finishing
15
77
Firewall forward
21
83
Flight Testing
2
8
Fuel Tanks
1
6
Fuselage
59
291
Hanger
4
0
Horizontal Stab
11
63
Interior & Upolstery
8
30
Landing Gear
7
28
Miscellaneous
14
48
Paint
4
30
Paint Designs
6
10
Panel
28
118
Panel Design
3
4
Panel Wiring
10
40
Plumbing & Wiring
26
114
Propeller
2
4
Propeller
2
3
Rudder
7
38
Upholstery-Interior
1
1
Vertical Stabilizer
4
19
Wheel Fairings
20
100
Wings
49
231
Copyright © 2001-2024 Matronics. All Rights Reserved.