Engine systems work will go on for some time. The mixture control assembly is now pretty much complete. I needed some drilled AN hardware to replace the temporary bolts in the assembly. This will allow better friction adjustment and will safety all the nuts on the mixture control as required. I also added the shielded wire access through the firewall in two places, hopefully this will be enough for the engine sensors and main power wires.