The right wing when on today with just a little bit of persuasion from me as Rafael pushed in the pins. At this point I only used the pins to position the wing and get it aligned to install the NAS high strength bolts which are knocked into place with considerable force. That will come next week once the LPS lubricant comes in from Aircraft Spruce. I also hooked up the fuel and vent lines and prepared the pitot heat for attachment after the wing bolts are in place and I also installed the rear and front single bolt attachment. All is going well at this point and I will attempt to do the same to the right wing next time in the shop.