Brief Description: Project status of N947CB as of May 2010
The big picture of my project N947CB
-Current time of construction is 2300 hours -Empennage is completed -Wings are completed -Controls are complete -Panel is installed -Interior is painted -The canopy is done -Plumbing is complete -Wiring is complete -Wheels and brakes are complete -Engine has been installed (Lycoming I/O 360 M1B Fuel Injected) -Engine plumbing is done and the engine monitor is complete -Cowl and spinner have been completed -Baffling is done -Avionic are installed -Wheel fairings and fiberglass finishing is done -Basic programming of all Avionics
Yet to Complete:
-Canopy latch -Detaied Programming the AFIS and EMS -Paperwork and inspections -Draining the storage oil from the engine and adding the break-in mineral oil -Starting the engine and preliminary pre filight check out -FAA inspection for Aircraft Certification paperwork -40 hours test flight program
-AND Painting the plane which I plane to farm out to a professional. I am thinking 50 more hours, .