Drilled holes and routed the wiring harness to the dynon displays ans componets. installed firewall kit for wires running through the firewall Installed cable into aero injector Drilled the hole for the mixture cable Drilled and tapped the holes for the aircleaner and installed it Installed both control grips and drilled holes for the PTT