Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
Challenger XL65
All
3-13-2012
< Previous Log Entry
Next Log Entry >
Date:
3-13-2012
Number of Hours:
6.00
Manual Reference:
Brief Description:
Installing tail so I can position the rudder stops
Faired the vert stab in with the fuslage and started installing the horz stab and elavator so I can position the rudder stops.
Installed fairing for vert stab
Installing dorsal fin
Installing rudder
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Challenger XL65 Home
Category
# Logs
# Hours
All
27
502
Avionics
2
52
Empennage
3
29
Engine
5
59
Final Assembly
3
28
Flight Training
1
5
Fuselage
4
43
Hanger Construction
3
28
Miscellaneous
1
20
None
1
200
Prop
1
2
Wings
3
36
Copyright © 2001-2024 Matronics. All Rights Reserved.