Powered By Kitlog Pro v2.0
Erik Builds a Little Wing
LW-5
All
8-13-2007
< Previous Log Entry
Next Log Entry >
Date:
8-13-2007
Number of Hours:
6.00
Manual Reference:
Brief Description:
Drew Fuse side on Building Board.
Took about 6 hours to draw fuse side on building board. Used scrap tube w/ centered holes in both ends to hold them temporarily while I began to put the hold-down blocks on.
Schnauzer inspects tbl saw w/ grinding wheel.
This is all the tube I own right now!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
LW-5 Home
Category
# Logs
# Hours
All
74
208
Details
3
0
Empennage
2
5
Fuselage
59
152
Miscellaneous
3
4
None
2
0
Shop Supplies
1
40
Tools
4
7
Copyright © 2001-2024 Matronics. All Rights Reserved.