I got an early start today and finished priming, riveting, and finish painting the baggage floors, aft seat floors, canopy decks and seat backs. I ran two corrugated tubes under the floors for additional wiring should it be needed in the future. I am waiting to rivet the floors until the last possible minute in case I need access. I bucked the rivets attaching the armrests and the angle pieces under the bulkhead where the canopy will latch (I can't remember the part number). I still need to cut the hinge pins for the seats and figure out the best way to rivet the canopy decks. I found my 12" #30 drill. It had fallen down behind the drawers in my toolbox. Fortunately, I was able to retrieve it with a magnet. I still haven't located my rudder cable fairings and I broke my 3/32" punch and my spring loaded center punch is dead, so I will still need an order from Avery Tools. Following Joe's recommendation, I am also going to order my flap pushrods from Avery. I am worn out.