KitLog pro

Powered By Kitlog Pro v2.0

CON'S WEB SITE
' style=
Date:  9-14-2013
Number of Hours:  7.75
Manual Reference:  8-1
Brief Description:  Began Firewall Construction

Up at 0500 to work on the plane before our EAA meeting (or maybe it was because the dogs just had to go out). The most difficult task is finding all of the kazillion parts. The most important item is a pair of gloves. I cut my hands a few times and didn't even realize it. The stainless firewall is sharper than I thought. I have everything clecoed and drilled with the exception of the Aux Fuel Pump doubler. I also fluted and seamed the majority of the bulkhead pieces. I hope to get in an early morning flight and then back to work on the RV.
' style=

Fabricating the F601J Brackets

Fabricating the F601J Brackets

' style=

Firewall Clecoed and Drilled

Firewall Clecoed and Drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.